Detention pond construction begins
- Hartselle Public Works began work Monday on one of two detention ponds that will be built behind the Hartselle Fine Arts Center and the Board of Education Building. The work shown above is for the smaller of the two ponds, which will be 300 feet by 60 feet. The ponds are being constructed to slow down the amount of water moving into the railroad and downtown area of Hartselle during heavy rains.| Randy Garrison